Dirk's slipper is already kaputt so we bring it to mr. quickie for repair. He was given a temporary rubber slipper while waiting. He dont want to wear both pair so he had a different set of slipper while walking around SM. Some of the mallers were surprised that a big german guy is wearing a different set of slipper, so if someone look at his foot, i just explain that his other pair is at mr. quickie, the funny thing is that i have to repeat the reason all over and over again.
With regards to the construction of our house, its now visible the first floor walls, slowly there are already four corners. It took two months for the workers to finish the foundation because of the different embedded cables and pipes including the one for water and aircon. It's pure concrete construction and no hollow blocks. Its an insulated wall with thermomass and styrofoam inside.
Its a very stable house that when its finish there will be more than 500 tons of cement used. Our workers said that its their first time to build such house. For philippine construction its the wall first and last is the flooring, but for us its the other way around.
Keine Kommentare:
Kommentar veröffentlichen